3860 Department of Water Resources
Infrastructure Overview

The Department of Water Resources has two major infrastructure programs: the State Water Project and the flood control system in the Central Valley. The State Water Project is a water storage and delivery system that consists of 28 dams and reservoirs, 22 pumping plants, 3 pumping-generating plants, 5 hydroelectric power plants, and more than 660 miles of canals and pipelines. The Project provides water to 23 million Californians and 755,000 acres of irrigated farmland. Existing flood control infrastructure in the Central Valley consists of 1,595 miles of levees, 348,000 acres of channels and floodways, nearly 800,000 linear feet of bank protection, and 55 various flood control structures. In general, these facilities provide more flood protection in urbanized areas and less in agricultural areas.


MAJOR PROJECT CHANGES Back to Top
  • The Budget provides $15.1 million from Proposition 84 to fund recreation and fish and wildlife enhancements at State Water Project facilities.

  • The Budget provides $48 million Proposition 1E for Systemwide Levee Evaluations and Repairs to help ensure weak portions of levees in the Central Valley are identified and repaired.

  • The Budget provides $61.5 million Proposition 1E for ten flood control capital projects: American River-Common Features, Folsom Dam Modification, West Sacramento, Mid-Valley Levee Reconstruction, Butte Slough Outfall Gates, Yuba River Basin, Sutter Basin, Lower Cache Creek-Woodland Area , Lower San Joaquin River Regional, and Sacramento County Streams.


SUMMARY OF PROJECTS Back to Top
Provides expenditures for each major and minor capital project funded in this state agency's budget for the past, current, and budget years. The project phase and fund classification are also identified. The Standard Footnotes key can be accessed by clicking on any footnote link.


Code State Building Program Expenditures Actual
2008-09*
Estimated
2009-10*
Proposed
2010-11*
01 CAPITAL OUTLAY      
  Major Projects      
10.95 CONTINUING FORMULATION OF THE CALIFORNIA WATER PLAN $-   $30,450   $-  
10.95.180 Franks Tract Pilot Project -   30,450 AWCb -  
20.95 IMPLEMENTATION OF THE STATE WATER RESOURCES DEVELOPMENT SYSTEM $526,160   $552,467   $1,001,691  
20.95.010 State Water Project Facilities Fish & Wildlife Enhancement & Recreation -   -   421,600 Cbn
20.95.020 Design, Right of Way, and Construction of the State Water Resources Development System 268,497 Vn 281,922 Vn 296,018 Vn
20.95.030 Operations and Maintenance of the State Water Resources Development System 14,990 Vn 15,739 Vn 16,526 Vn
20.95.050 Financial and Contract Management of the State Water Resources Development System 242,673 Vn 254,806 Vn 267,547 Vn
30.95 PUBLIC SAFETY AND PREVENTION OF DAMAGE $246,168   $553,790   $129,172  
30.95.010 Sacramento River Bank Protection Project 42 ACg -   -  
30.95.026 Land Acquisition for Mitigation Bank(s) to Support Delta Levee Repairs -   -   1,094 Vb
30.95.030 Merced County Streams, Castle Dam Unit 334 Cg 130 Cr -  
30.95.105 Marysville/Yuba Levee Reconstruction 3 ACg 397 ACg -  
30.95.111 1997 Flood Damage Repair Projects -   483 ACgr -  
30.95.115 American River Flood Control Project Phase 1 - Common Elements 8,227 ACgbr 13,629 ACbr 7,017 ACbr
30.95.130 West Sacramento Project -   1,511 Cbgr 3,125 SCbr
30.95.155 Mid-Valley Levee Reconstruction Project 56 ACb 3,580 ACbr 2,650 Cbr
30.95.160 West Sacramento Early Implementation Project 121 ACb 87,174 ACb -  
30.95.200 Magpie Creek Small Flood Control Project -   2,019 AWCb -  
30.95.206 Natomas Levee Improvement Program Early Implementation Project 193,405 ACb 615 ACb -  
30.95.211 1997 Flood Damage Repair Projects - San Joaquin Valley -   346 ACg -  
30.95.215 Lower Sacramento Area Levee Reconstruction Project -   28 ACg -  
30.95.220 Upper Sacramento Area Levee Restoration Project 403 ACgr 399 Agr -  
30.95.245 American River Flood Control Project - Natomas Features 2 Og -   -  
30.95.250 Yuba River Basin Project 548 Wb 186 Wbr 2,723 WCbr
30.95.251 Marysville Ring Levee Reconstruction Project -   17,622 Cbr -  
30.95.255 Eastside Bypass Levee Raising Project -   55 ACg -  
30.95.260 South Sacramento County Streams 10,829 AWCbr 18,682 AWCbr 6,150 Cbr
30.95.295 Tehama Section 205 Flood Control Project -   704 Cgr -  
30.95.302 Sutter Basin Feasibility Study -   -   1,872 Sbr
30.95.306 West Stanislaus Feasibility Study 18 Sb 737 Sb -  
30.95.310 Lower Cache Creek, Yolo County, Woodland Area Project -   -   1,557 Sbr
30.95.311 Folsom Dam Modifications Project 11,665 Cbgr 78,832 Cbr 38,150 ACbr
30.95.314 Frazier Creek/Strathmore Creek Feasiblity Study -   1,167 Sbr -  
30.95.315 White River/Deer Creek Feasiblity Study -   1,167 Sbr -  
30.95.316 Merced County Streams Project Bear Creek Unit -   2,300 Cbr -  
30.95.320 Lower San Joaquin River Regional Project -   -   1,729 Sb
30.95.328 American River Watershed, Folsom Dam Raise Project -   9,309 ACb -  
30.95.330 American River Watershed, Folsom Dam Raise Project, Bridge Element 2,757 ACbg 3,698 ACbgr -  
30.95.335 Emergency Levee Repair Work 15,141 Cg -   -  
30.95.337 Butte Slough Outfall Gates Rehabilitation Project -   -   15,105 WCb
30.95.340 Systemwide Levee Evaluations and Repairs 2,617 ACb 243,383 ACb 48,000 Vb
30.95.341 State-Federal Flood Control Evaluations -   35,200 Wb -  
30.95.342 Sutter Pumping Plants' Control System -   7,122 ACb -  
30.95.343 Sutter Bypass East Water Control Structures -   7,992 Cb -  
30.95.344 Knights Landing Outfall Gates Rehabilitation -   10,273 ACb -  
30.95.345 Sacramento Yard-Soil and Groundwater Investigation and Remediation -   5,050 WCb -  
  Totals, Major Projects $772,328   $1,136,707   $1,130,863  
Total Expenditures (All Projects) $772,328   $1,136,707   $1,130,863  

FUNDING Back to Top
Fund Code Fund Actual
2008-09*
Estimated
2009-10*
Proposed
2010-11*
0001 General Fund $17,217 $1,167 $-
0502 California Water Resources Development Bond Fund - - 406,497
0506 Central Valley Water Project Construction Fund 526,160 552,467 580,091
0995 Reimbursements 6,982 49,350 18,601
6008 State Capital Protection Subaccount - 4,980 -
6026 Bay-Delta Multipurpose Water Management Subaccount - 20,450 -
6031 Water Security, Clean Drinking Water, Coastal and Beach Protection Fund of 2002 - 10,000 -
6051 Safe Drinking Water, Water Quality and Supply, Flood Control, River and Coastal Protection Fund of 2006 18 2,071 16,197
6052 Disaster Preparedness and Flood Prevention Bond Fund of 2006 221,951 496,222 109,477
Total Expenditures (All Funds) $772,328 $1,136,707 $1,130,863

Refer to the
Infrastructure Detail of Appropriations and Adjustments (pdf * - 5K) document for additional information.